News and Construction alerts about the transformation of Jefferson Street into a more pedestrian and bicycle friendly street.

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
  • Login

Update on Leavenworth/Jefferson intersection work, Leavenworth traffic reroute

Posted on in Construction Alerts
  • Font size: Larger Smaller
  • Subscribe to this entry
  • Print

Last week it was announced that Leavenworth (between Beach and Jefferson) needed to be closed for vehicles travelling north. This was due to work at the Leavenworth/Jefferson intersection that would last about three weeks.

 

That work has been pushed back and will be performed at another time, most likely in the next two or three weeks. So for now, Leavenworth and that intersection will remain in its current traffic configuration: OPEN.

 

When the time comes to perform that intersection work, a notice about the traffic changes will be sent out in advance. Also, when work is performed at other intersections at Hyde and at Jones, a notice will be distributed about any temporary traffic reroutes.

 

--

 

The south sidewalk has been poured from Leavenworth all the way to the NPS entrance near Hyde. Also the bulb out at the Jefferson/Hyde southeast corner has been poured. Depending on the weather, plans are to complete this block on the south side this week. Moving along!